Sarawak Vehicle Passage Checks Are Open!
VEHICLE SHIPSARAWAK · PASSAGE BLUEPRINT

DRAWING VS—24 / SARAWAK VEHICLE PASSAGE

Measure the passage before the vehicle moves.

A working blueprint for origin, terminal, sea method, verified sailing window and Sarawak release—without pretending an estimate is a confirmed booking.

01
actual origin
02
sea methods
03
verified records
Malaysian vehicle at a port ramp prepared for a Sarawak sea passage
VIEW APKG → KCH / BTU
X0 · PORT KLANGX1 · RORO / CONTAINERX2 · SOUTH CHINA SEAX3 · KUCHING / BINTULU

ORTHOGRAPHIC CHECK / 06

Six callouts define one useful passage.

Each point changes the operational answer. Read the drawing from origin to receiver.

Origin yard
01

Origin yard

Name the actual handover point before a rate is treated as relevant.

Port terminal
02

Port terminal

Northport and Westport are different operating references.

Sea method
03

Sea method

RORO and container use different acceptance paths.

Kuching
04

Kuching

Senari is the primary Sarawak gateway in this plan.

Bintulu
05

Bintulu

A separate destination that needs its own live window.

Receiver
06

Receiver

Link collection instructions to the correct person.

DIMENSION PLATES / 04

Start with the physical vehicle class.

A final quote still follows the terminal, slot, dimensions and handling scope.

PLATE 01Motorcycle

Motorcycle

from RM1,100
PLATE 02Sedan / hatchback

Sedan / hatchback

from RM1,895
PLATE 03SUV / MPV / 4×4

SUV / MPV / 4×4

from RM1,965
PLATE 04Large vehicle

Large vehicle

confirm dimensions

SECTION B—B / METHOD

Two sea methods, two handling drawings.

Choose the method only after the vehicle and terminal are known.

RORO
SECTION B—B

RORO

Driveable vehicle, port acceptance and a verified sailing window.

Open method →
CONTAINER
SECTION C—C

CONTAINER

Positioning, restraint and seal depend on the confirmed handling scope.

Open method →

PASSAGE SEQUENCE / 06

A section line from brief to release.

The order keeps assumptions from jumping ahead of verified facts.

  1. Route brief
    01

    Route brief

    Origin, Sarawak port and target month.

  2. Vehicle profile
    02

    Vehicle profile

    Model, dimensions and running condition.

  3. Method check
    03

    Method check

    Match RORO or container to the real scope.

  4. Schedule window
    04

    Schedule window

    Use only verified voyage records.

  5. Condition record
    05

    Condition record

    Capture the visible state before handover.

  6. Release plan
    06

    Release plan

    Confirm receiver and optional land movement.

EVIDENCE LAYER / 06

Visible proof before and after the sea leg.

Survey Report images connect the vehicle, its condition and the handover.

Vehicle evidence view 1
PHOTO 01
Vehicle evidence view 2
PHOTO 02
Vehicle evidence view 3
PHOTO 03
Vehicle evidence view 4
PHOTO 04
Vehicle evidence view 5
PHOTO 05
Vehicle evidence view 6
PHOTO 06

REVISION CHECK / WHATSAPP

Name the origin, vehicle and real Sarawak destination.

Check the passage now